Footway Reconstruction: replacing existing paving slabs with asphalt and concrete block paving at dropped kerbs and street corners.
New kerb line installed and footway prepared for asphalt laying. Areas of block paving also installed on-site.
Footways are being laid with a sustainable lower temperature mix asphalt where 2.4kgs of CO2 can be saved per tonne laid in comparison to conventional hot mix asphalt.